Accessing Public File; Downloading from 'Sith;Sarias'
Download Complete; Displaying File:
Download Complete; Displaying File:
Sith Zevasa Project - Colox
![[Image: HWj1myA.png]](https://i.imgur.com/HWj1myA.png)
Project Overview
Participants:
Sith Zevasa (Purifier)
Summary
The project aims to centralize and streamline the production of Wool harvested from the Coloxian Sheep-Frogs, located on the planet of Colox. Currently tended to and harvested by local alien farmers, the project aims to subjugate them and take over the current farms. Prefab buildings will initially be installed once the takeover is completed, staffed by a small delegation of slaves. Droids, or a small delegation of imperials, will act as security with a perimeter of fencing, walls and basic barricades.
Once secured and production is within reach of resuming, a meeting will be held to discuss the finer details of production lines, location and potential refinement. Costs of construction and machinery will be covered by the labour wages to the farmers, who shall function as slaves. Modernised farming techniques and selective breeding for greater yields, is to be implimented following the meeting. Potential genetic modification is a consideration for now.
The Research Bureau shall assist with funding the initial prefab buildings, landing pads and other key essentials. Transportation of product will initially be covered by shuttles from Atrum Logistics, to be replaced at a later date.
Development
Current Phase 2 - Development
Project has been accepted, the relevant individuals patched into Research Bureau HUB.
Current tasks being worked on
1: Sith Zevasa will create an operation to see the farms brought into the imperial fold. Following this, a stock of surviving farmers, current sheep frog numbers and farmlands will be taken, to locate a suitable spot for imperial prefabrication buildings. Completed
2:: Sith Zevasa is working on securing his own troops for the long-term staffing and oversight of the operation. - Completed
3:: Sith Zevasa shall contact logistics pertaining to the transport of prefab buildings, starting with a small amount. While its under construction, a meeting between relevant parties shall decide the structure of the farms output, production and potential future exspansion.
Spoiler: Update Logs
Documentation and Reports
![[Image: 66iciMH.png]](https://i.imgur.com/66iciMH.png)